This is one of my best houses. Started in 2020, it got stalled during Covid and completed in 2025. The General Contractor was “Madrona Northwest”. Photography by Damian Vines.
Front of the house is 3 stories, as the site slopes up and down from there.
Drone shot of the rear of the house that no one can see because of the cliff that it is sitting on a cliff.
Front entry sports double posts and wood siding.
Front entry welcomes you in.
Front entry door is over-sized.
After walking into the front door, this entry stair connects all 3 levels down to the garage.
Another stair shot, looking down into the living room.
Stairs looking down from the upper level.
Kitchen
Kitchen pulls in the forest setting with the green cabinets.
Master Bath
Master Bath
Powder Room features a floating thick live edge wood counter.
Covered deck off the kitchen is great for entertaining
Third floor Family Room sports a gas fireplace.
Third floor Family room other side
Third floor bathroom